Surface Water Treatment Plant Environmental Reports

Contact Information

Irrigation Operations
Mon. - Fri. 7am to 4pm
(209) 526-7639

Customer Service
Mon. - Fri. 8am to 5pm
(209) 526-7337 or
(888) 335-1643 toll-free

Final Subsequent Environmental Impact Report - June 2005

 

Complete Report in one file - ( PDF - 2.68 MB ) or select separate sections:

Contents: Table of Contents- ( PDF - 43 KB )
  List of Tables
List of Figures
List of Abbreviations
Chapter 1: Introductory Comments on the Final Subsequent EIR - ( PDF - 38 KB )
  CEQA Compliance
Format and Organization of the FSEIR
Public Review of the DSEIR
Public Meeting on the DSEIR
Revisions to the DSEIR
Comments Received on the DSEIR
Preparation of the FSEIR
Lead Agencies
FSEIR Authors
Chapter 2: Comments and Responses - ( PDF - 1.82 MB )
 

Introduction
Comments and Responses
Responses to Department of Water Resources (November 23, 2004)
Responses to Department of Transportation (December 3, 2004)
Responses to Tuolumne River Trust (December 13, 2004)
Responses to City of Waterford (February 10, 2005)
Responses to California State Water Resources Control Board (March 4, 2005)
Attachment A - Urbanized Lands in the Greater Modesto Area - ( PDF - 204 KB )
Attachment B - Don Pedro End of the Month Storage - ( PDF - 176 kB )

Chapter 3: Revisions to Draft Subsequent Environmental Impact Report - ( PDF - 68 KB )
  Introduction
Revisions

Mitigation Monitoring and Reporting Plan - June 2005

Complete Plan document - ( PDF - 138 KB )
Contents:

 

Table of Contents
Acronyms and Abbreviations
Purpose of and Need for Monitoring
Project Description
Mitigation Monitoring Program

Table 1:

Mitigation Monitoring and Reporting Plan for MRWTP Phase Two Expansion, Mitigation Measures

Table 2: Mitigation Monitoring and Reporting Plan for MRWTP Phase Two Expansion, Environmental Commitments

MRWTP Phase Two Expansion Project Subsequent Environmental
Impact Report Public Review Draft - November 2004

Complete Report in one file - (PDF - 15.68 MB)
or select separate sections:

Executive Summary - (PDF - 257KB)
Contents Table of Contents
Cover
Title Page
Acronyms and Abbreviations
Chapter 1 Introduction
Chapter 2 Project Description
Chapter 3 Environmental Analysis
Chapter 4 Other CEQA Considerations
Chapter 5 Alternatives
Chapter 6 Water Transfer Petition Information
Chapter 7 Report Preparation
Chapter 8 References Cited
Appendix A Notice of Preparation and Initial Study
Appendix B Comment Letters Received on the Notice of Preparation and Initial Study
Appendix C Significant Impacts and Mitigations, Alternative A3, Modesto Surface Water Treatment Plant
Appendix D Visual Analysis Concepts and Definitions
Appendix E Water Supply Modeling
Appendix F Background Information on Acoustics
Appendix G City of Modesto Noise Policies
Figures  
  2-1 - Location Map
2-2 - Modesto Regional Water Treatment Facility Expansion, Conventional Option
2-3 - Modesto Regional Water Treatment Facility Expansion, Membrane Option
2-4 - MRWTP Phase Two Expansion Project
2-5 - North Storage Tank
2-6 - West Storage Tank
2-7 - Southeast StorageTank
2-8 - Distribution Pipelines
3.1-1 - Photo 1 & 2
3.1-1 - Photo 3 & 4
3.1-1 - Photo 5 & 6
3.1-1 - Photo 7 & 8
3.1-1 - Photo 9
3.4-1 - City of Modesto Water Supply and Demand
3.4-2 - Modesto Reservoir Operating Levels
3.4-3 - Don Pedro End of Month Storage
3.4-4 Tuolumne River Releases from La Grange Dam, Average Cubic Feet Per Second Per Month, Scatter Plot
3.9-1 Location of Elderberry Shrubs and Valley Elderberry
Longhorn Beetle

Environmental Reports for Phase One MRWTP - 1989/1990

This document requires Adobe Acrobat Reader for viewing. If you do not have Acrobat installed, download the free viewer.

MID on YouTube MID on Twitter MID Rss Feeds

Service Requests

Electric Service Guide
Report a Power Outage
Rates & Rules of Service

MID Contacts

Modesto Irrigation District
1231 11th Street, Modesto
Mon-Fri. 8am - 5pm
(209) 526-7373

Mailing Address
P.O. Box 4060
Modesto, CA 95352-4060

Customer Service
Mon. - Fri, 8am to 5pm
(209) 526-7337 or
(888) 335-1643 toll-free

Irrigation Customers

Irrigation Rates/Allotment